
Concrete before the beginning of the project shows sinkage and potential tripping hazards

Mid-installation. Dylon M. injects PolyLevel into pre-drilled holes while monitoring the lifting process.

Post-Installation. The entire walkway was lifted and then sealed with our NexusPro.